A 14 m island-platform interchange station with a single-arch, double-deck structure, mined by the double-side drift method; excavation section 445.07 m².
Key parameters and scope of the project
| 项目要素 / Key Fact | 内容 / Detail |
|---|---|
| Project Type | Rail Transit · Mined Station (Interchange) |
| Contract Value | ¥67.68 million |
| Location | Directly beneath Daxuecheng Zhonglu, south of its intersection with Kangcheng Road, Shapingba District, Chongqing |
| Interchange | Interchange with Daxuecheng Zhonglu Station on Line 15, with one interchange passage |
| Station Length | Designed length 252.05 m |
| Platform | 14 m island platform, single-arch double-deck structure |
| Ancillary Structures | 3 entrances/exits, 1 interchange passage, 2 ventilation-plant groups, 1 construction adit |
| Excavation Section | 445.07 m² (W 25.04 m × H 21.05 m) |
| Burial Depth | Crown overburden approx. 13–17 m, of which rock cover approx. 7–13 m — a shallow tunnel |
| Rock Mass | Interbedded sandstone and mudstone, predominantly mudstone |
| Major-End Section | Daxuecheng Zhonglu–Pengjiayuanzi running section, 1,586 m, TBM-driven, with a dedicated TBM launch shaft at the major end |
| Construction Method | Mining method — double-side drift method |
| Client | Sinohydro Bureau 7 (Sinohydro Engineering Bureau No.7) |
Overview · Geology and depth · Construction method and schedule
Daxuecheng Zhonglu Station lies directly beneath Daxuecheng Zhonglu on the south side of its intersection with Kangcheng Road, interchanging with Daxuecheng Zhonglu Station on Line 15. The station is 252.05 m long: a 14 m island platform with a single-arch, double-deck structure.
The station has 3 entrances/exits, 1 interchange passage (to Line 15) and 2 ventilation-plant groups, plus 1 construction adit. The major-end running section (Daxuecheng Zhonglu–Pengjiayuanzi) is 1,586 m long and is TBM-driven, with a dedicated TBM launch shaft at the major end.
The station is shallow-buried. The rock mass is interbedded sandstone and mudstone, predominantly mudstone; the crown overburden is about 13–17 m, of which the rock cover is about 7–13 m — classifying it as a shallow tunnel.
The main station is constructed by the mining method using the double-side drift sequence. The station tunnel is 25.04 m wide and 21.05 m high in excavation, with an excavation section area of 445.07 m².
Key milestones: ventilation plant group, shaft, tunnel entry, invert and central-partition removal